This was a project to convert a stone double garage into a 2 storey annexe. The project invlolved a number of stages to ensure the best possible result for the client. The first task was to fix the plumbing and drainage for the building. This included tapping into the existing supply lines and placing them in the required positions for the interior workings.
The next step was to level the interior and exterior of the building in preparation for the florring to go down and to ensure the safety of the workplace. This also included fitting the manhole covers for access at a later date. Ensuring safe access to the worksite is the top of our priority list to avoid any onsite injuries to our team or our clients when we are not on-site at the end of the day.